LEVERAGE
LEarn from Video Extensive Real Atm Gigabit Experiment

Element management for the LEVERAGE trial: Deliverable DWP341

A zipped version of this document can be downloaded here.

Abstract :
This deliverable is divided into two very distinct parts. The first one contains the description of a first implementation of a management system for the Ascom optical ring network to be installed at the site of Cambridge; whereas the second one discusses some issues concerning traffic management with respect to Ascom’s access nodes.

Authors: ASCOM, INT
Date: 31/10/96

Contents:

  1. INTRODUCTION
  2. USER INTERFACE
      2.1 Ring View
      2.2 Node View
      2.3 Monitoring
      2.4 Startup Tasks
  3. CONFIGURING AN ASCOM ACCESS NODE
      3.1 Node Discovery
      3.2 Ensure Components are "In-service"
      3.3 Configure ATM Interface
  4. CREATING PERMANENT CONNECTIONS
      4.1 VP Cross Connection
        4.1.1 Create VPIs 4 and 5
        4.1.2 Cross-Connect VPIs
      4.2 VC Cross Connection
        4.2.1 Create VPIs
        4.2.2 Create VCIs
        4.2.3 Cross Connect VCIs
  5. TOPOLOGY MANAGEMENT
      5.1 Discovering Changes
      5.2 Replacing Components
  6. CHANGING CONNECTION PARAMETERS
      6.1 Modifying Connections
      6.2 Removing Connections
      6.2.1 VP Cross Connection
      6.2.2 VC Cross Connections
  7. DESCRIPTION OF AN ASCOM ACCESS NODE
  8. QOS CHARACTERISATION
      8.1 Definition of QoS criteria
      8.2 QoS Level for LEVERAGE experiments
      8.3 Specification of the reference traffic profile
  9. TRAFFIC-RELATED LIMITS OF THE ARCHITECTURE
      9.1 The case of symmetric, balanced traffic
      9.2 Traffic imbalances
  10. DIMENSIONING ACCESS NODES
      10.1 The simulation approach
      10.2 Results
  11. GENERAL REMARKS


LEVERAGE home page

Last updated 5th January 1998
E-mail: leverage@cilt.org.uk