Element management for the LEVERAGE trial: Deliverable DWP341
A zipped version of this document can be downloaded here.
Abstract :
This deliverable is divided into two very distinct parts. The first one contains the description of a first implementation of a management system for the Ascom optical ring network to be installed at the site of Cambridge; whereas the second one discusses some issues concerning traffic management with respect to Ascom’s access nodes.
Authors: ASCOM, INT
Date: 31/10/96
Contents:
- INTRODUCTION
- USER INTERFACE
2.1 Ring View
2.2 Node View
2.3 Monitoring
2.4 Startup Tasks
- CONFIGURING AN ASCOM ACCESS NODE
3.1 Node Discovery
3.2 Ensure Components are "In-service"
3.3 Configure ATM Interface
- CREATING PERMANENT CONNECTIONS
4.1 VP Cross Connection
4.1.1 Create VPIs 4 and 5
4.1.2 Cross-Connect VPIs
4.2 VC Cross Connection
4.2.1 Create VPIs
4.2.2 Create VCIs
4.2.3 Cross Connect VCIs
- TOPOLOGY MANAGEMENT
5.1 Discovering Changes
5.2 Replacing Components
- CHANGING CONNECTION PARAMETERS
6.1 Modifying Connections
6.2 Removing Connections
6.2.1 VP Cross Connection
6.2.2 VC Cross Connections
- DESCRIPTION OF AN ASCOM ACCESS NODE
- QOS CHARACTERISATION
8.1 Definition of QoS criteria
8.2 QoS Level for LEVERAGE experiments
8.3 Specification of the reference traffic profile
- TRAFFIC-RELATED LIMITS OF THE ARCHITECTURE
9.1 The case of symmetric, balanced traffic
9.2 Traffic imbalances
- DIMENSIONING ACCESS NODES
10.1 The simulation approach
10.2 Results
- GENERAL REMARKS
|